Define production and storage
Bring the required daily volume, peak demand, feed water analysis and operating hours. Review production ratings against their stated test conditions.
Review the whole installation
Discuss pretreatment, storage, pumping, drainage and maintenance. Compare electrical and water supply requirements before committing to an equipment configuration.

